The Cornerstone SWMS Document Store

Professional SWMS and SOP documents for the construction industry. Instantly downloadable and auto-populated with your company details.

Browse by category

The Cornerstone SWMS Promise

Instant Download

PDF after purchase

WHS 2011 Aligned

All states & territories

Auto-Populated

Your details pre-filled

Professionally Formatted

Structured WHS layout

Read our Construction SWMS guide

Learn the hazards and controls before you choose a document

58 of 261 documents· 6 bundles

Document Bundles

Best Value

Save more by purchasing multiple SWMS & SOPs together — includes all related SOPs at no extra cost

1 bundle
ConstructionSave 50%

Construction SWMS MEGA Pack

Everything your construction site needs, all in one place. This comprehensive MEGA Pack delivers 19 ready-to-use SWMS documents covering the full spectrum of high-risk construction activities — from crane and concrete pump operation to hoists, lifts, crawlers, and much more. Construction sites are among the most safety-critical environments in Australia, with heavy machinery, elevated work, and complex logistics creating serious risk at every turn. Having the right SWMS documentation in place isn't just a legal obligation — it's what keeps your workers going home safe every day. At just $284.00 AUD, you're saving over $285 compared to purchasing individually — that's 50% off, making this the smartest investment you can make for your site's safety and compliance library. Whether you're a builder, project manager, or safety officer, this pack gives you the documentation backbone to run a compliant, professional operation from day one.

19 SWMS + 19 SOPs (38 documents total)

Mobile Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-010)
Mobile Crane Operation (SOP-CRN-010)free
Tower Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-003)
Tower Crane Operation (SOP-CRN-003)free
Concrete Pump Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CON-001)
Concrete Pump Operation (SOP-CON-001)free
VLC Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-005)
Vehicle Loading Crane Op. (SOP-CRN-005)free
Welding Machine Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-WLD-001)
Welding Operations (SOP-WLD-001)free
Rough Terrain Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-001)
Rough Terrain Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure) (SOP-CRN-001)free
Knuckle Boom Lift Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-EWP-001)
Knuckle Boom Lift Op. (SOP-EWP-001)free
Concrete Line Pump Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CON-002)
Concrete Line Pump Op. (SOP-CON-002)free
Concrete Boom Pump Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CON-003)
Concrete Boom Pump Op. (SOP-CON-003)free
Hammerhead Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-002)
Hammerhead Crane Op. (SOP-CRN-002)free
Brick Elevator Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-HOI-002)
Brick Elevator Operation (SOP-HOI-002)free
Slewing Mobile Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-004)
Slewing Mobile Crane Op. (SOP-CRN-004)free
Materials Hoist Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-HOI-003)
Materials Hoist Operation (SOP-HOI-003)free
Trailer Boom Lift Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-EWP-006)
Trailer Boom Lift Op. (SOP-EWP-006)free
Overhead Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-006)
Overhead Crane Operation (SOP-CRN-006)free
Hydraulic Crawler Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-007)
Hydraulic Crawler Crane Op. (SOP-CRN-007)free
Lattice Crawler Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-008)
Lattice Boom Crawler Crane (SOP-CRN-008)free
Non-Slewing Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-009)
Non-Slewing Crane Op. (SOP-CRN-009)free
Crane Loading Platform Operation (Including Pre-Operational Inspection and Shutdown Procedure)(SWMS-CRN-011)
Crane Loading Platform Op. (SOP-CRN-011)free

Scroll to see all documents

$425.00AUD

Individually $853.10— save $428.10

Showing bundles for "Construction" —

SWMS Documents

Safe Work Method Statements

19 documents
SWMSConstruction

Brick Elevator Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-HOI-002

Essential SWMS for safe operation of brick elevators on construction sites.

$29.95
SWMSConstruction

Concrete Boom Pump Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CON-003

Essential SWMS for safe operation of Concrete Boom Pumps.

$29.95
SWMSConstruction

Concrete Line Pump Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CON-002

SWMS for Concrete Line Pump detailing hazards and compliance requirements.

$29.95
SWMSConstruction

Concrete Pump Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CON-001

Essential safety document for managing concrete pump operations and mitigating risks.

$29.95
SWMSConstruction

Crane Loading Platform Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CRN-011

Comprehensive SWMS for Crane Loading Platform operations ensuring workplace safety.

$29.95
SWMSConstruction

Hammerhead Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CRN-002

Essential safety document for Hammerhead Crane operations and risk management.

$29.95
SWMSConstruction

Hydraulic Crawler Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CRN-007

Essential SWMS for safe operation of Hydraulic Crawler Cranes.

$29.95
SWMSConstruction

Knuckle Boom Lift Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-EWP-001

Comprehensive SWMS for Knuckle Boom Lift operations ensuring workplace safety.

$29.95
SWMSConstruction

Lattice Crawler Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CRN-008

Comprehensive SWMS for safe operation of lattice crawler cranes.

$29.95
SWMSConstruction

Materials Hoist Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-HOI-003

Essential SWMS for safe use of materials hoists in construction.

$29.95
SWMSConstruction

Mobile Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CRN-010

Essential SWMS for safe mobile crane operations and risk management.

$29.95
SWMSConstruction

Non-Slewing Crane Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CRN-009

Essential SWMS for safe operation of non-slewing cranes.

$29.95

SOP Documents

Standard Operating Procedures

21 documents
SOPConstruction

Brick Elevator Operation

SOP-HOI-002

Essential SOP for safe operation of brick elevators in construction.

$14.95
SOPConstruction

Cement Mixer Operation

SOP-CON-008

Essential SOP for safe cement mixer operation, covering key hazards and safety measures.

$14.95
SOPConstruction

Concrete Boom Pump Op.

SOP-CON-003

Essential SOP for safe operation of Concrete Boom Pumps in the workplace.

$14.95
SOPConstruction

Concrete Finishing Equip. Op.

SOP-CON-007

Essential SOP for safe operation of concrete finishing equipment.

$14.95
SOPConstruction

Concrete Line Pump Op.

SOP-CON-002

Essential SOP for safe concrete line pump operation and risk management.

$14.95
SOPConstruction

Concrete Pumping Operations

SOP-CON-005

Essential SOP for safe concrete pumping operations with injury prevention guidelines.

$14.95
SOPConstruction

Drilling Operations

SOP-DRL-002

Comprehensive SOP for safe drilling operations covering all relevant hazards and regulations.

$14.95
SOPConstruction

Explosive-Powered Tool Op.

SOP-EPT-001

Essential SOP for safe operation of explosive-powered tools in construction environments.

$14.95
SOPConstruction

Materials Hoist Operation

SOP-HOI-003

Essential SOP for safe materials hoist operation to prevent workplace injuries.

$14.95
SOPConstruction

Nail Gun & Fastening Op.

SOP-FAS-001

Essential SOP for safe nail gun operation to prevent serious injuries and hazards.

$14.95
SOPConstruction

Polishing Operations

SOP-ABR-003

Essential SOP for safe polishing operations detailing hazards and compliance measures.

$14.95
SOPConstruction

Power & Cordless Tool Safety

SOP-PWT-001

Ensure safety with our comprehensive Power & Cordless Tool Safety SOP.

$14.95
Cornerstone SWMS

Professional SWMS and SOP documents for Australian workplaces. Professionally drafted, editable, and instantly downloadable.

Legislation & Standards

  • Work Health and Safety Act 2011 (Cwlth)
  • State & Territory WHS Legislation
  • Safe Work Australia Guidelines

Disclaimer: All documents provided on this platform are templates and starting points only. They must be reviewed, adapted, and approved by the Person Conducting a Business or Undertaking (PCBU) or facilitated by a designated WHS Manager, Site Supervisor, or Principal Contractor, before use at any specific worksite. Site-specific hazards, conditions, and legislative requirements may vary. Cornerstone SWMS accepts no liability for documents used without appropriate review and customisation.

© 2026 Cornerstone SWMS. All rights reserved.