SOPMechanical & Plant

Loader Operation

SOP-EAR-009

Part of (SWMS-EAR-009B)

About this Document

The Loader Operation SOP (SOP-EAR-009) provides detailed guidelines for safely operating loaders, addressing significant hazards such as loader rollovers, personnel runovers, load drops, and dust inhalation. Essential for operators and safety officers in construction and civil works, this document ensures compliance with the Work Health and Safety Act and relevant regulations. Implementing this SOP helps mitigate serious injuries and fatalities, making every loading operation safer for personnel and equipment.

Hazards & Risks Covered

  • Loader rollover on uneven ground, slopes, or soft fill – serious injury or fatality
  • Runover of personnel – serious injury or fatality
  • Load drop during crane lifting – serious injury or fatality
  • Contact with underground services during earthmoving
  • Dust inhalation (including silica) from loading operations
  • Pedestrian struck by swinging bucket or loader arms
  • Tipping truck struck by loader bucket during loading operations

Legislation & Codes of Practice

  • Work Health and Safety Act 2011 (Cth) and applicable state/territory WHS legislation
  • Work Health and Safety Regulation 2017 (Cth) – Part 3.1 and Schedule 18
  • Dial Before You Dig (DBYD)
  • Safe Work Australia – Code of Practice: Managing the Risks of Plant in the Workplace (2024)
  • Safe Work Australia – Managing Risks of Respirable Crystalline Silica
  • Loader Pre-Start Checklist (associated document)

What You Receive

PDFPersonalised PDF

SOP Only

$14.95AUD
  • Personalised PDF document
  • Instant download after purchase
  • Auto-populated with your company details
Cornerstone SWMS

Professional SWMS and SOP documents for Australian workplaces. Professionally drafted, editable, and instantly downloadable.

Legislation & Standards

  • Work Health and Safety Act 2011 (Cwlth)
  • State & Territory WHS Legislation
  • Safe Work Australia Guidelines

Disclaimer: All documents provided on this platform are templates and starting points only. They must be reviewed, adapted, and approved by the Person Conducting a Business or Undertaking (PCBU) or facilitated by a designated WHS Manager, Site Supervisor, or Principal Contractor, before use at any specific worksite. Site-specific hazards, conditions, and legislative requirements may vary. Cornerstone SWMS accepts no liability for documents used without appropriate review and customisation.

© 2026 Cornerstone SWMS. All rights reserved.