SOPRoofing

Roof Tile Elevator Op.

SOP-HOI-004

About this Document

The SOP for Roof Tile Elevator Operation outlines critical safety measures to mitigate risks such as falling tiles, entanglement with machinery, and falls from height. It is essential for workers and supervisors in roofing operations to ensure compliance with WHS regulations and to safeguard against potential hazards. This document is invaluable for promoting workplace safety and preventing serious injuries, thereby enhancing operational efficiency.

Hazards & Risks Covered

  • Falling tiles from the elevator carriers → struck-by injury or fatality
  • Falls from height at the discharge end on the roof → fatality
  • Entanglement with the chain or belt drive → amputation
  • Elevator tip-over due to inadequate footing or anchorage
  • Electrical hazards from cables and motors
  • Manual handling injuries from loading and stacking tiles
  • Overloading carriers causing mechanical failure

Legislation & Codes of Practice

  • Work Health and Safety Act 2011 (Cth) and applicable state/territory WHS legislation
  • Work Health and Safety Regulation 2011 (Cth) — Part 3.1 Plant; Part 4.4 Falls
  • AS/NZS 1891 series — Industrial fall-arrest systems and devices
  • AS 1418.10 — Cranes, hoists and winches — Mobile elevating work platforms (related)
  • Safe Work Australia — Code of Practice: Managing the Risk of Falls at Workplaces
  • Safe Work Australia — Code of Practice: Managing the Risks of Plant in the Workplace
  • Roof Tile Elevator Pre-Start Checklist (associated document)

What You Receive

PDFPersonalised PDF

SOP Only

$14.95AUD
  • Personalised PDF document
  • Instant download after purchase
  • Auto-populated with your company details
Cornerstone SWMS

Professional SWMS and SOP documents for Australian workplaces. Professionally drafted, editable, and instantly downloadable.

Legislation & Standards

  • Work Health and Safety Act 2011 (Cwlth)
  • State & Territory WHS Legislation
  • Safe Work Australia Guidelines

Disclaimer: All documents provided on this platform are templates and starting points only. They must be reviewed, adapted, and approved by the Person Conducting a Business or Undertaking (PCBU) or facilitated by a designated WHS Manager, Site Supervisor, or Principal Contractor, before use at any specific worksite. Site-specific hazards, conditions, and legislative requirements may vary. Cornerstone SWMS accepts no liability for documents used without appropriate review and customisation.

© 2026 Cornerstone SWMS. All rights reserved.