SWMSCivil Works

Dozer Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-EAR-003

About this Document

The SWMS-EAR-003 Dozer is designed to address and manage risks associated with dozer operations in civil works. This document covers critical hazards such as mechanical defects, stockpile collapse, and roll-over, ensuring that all personnel are aware of safety procedures and legislative requirements. It is essential for employers and workers in construction and excavation to mitigate risks and maintain compliance with WHS regulations.

Hazards & Risks Covered

  • Mechanical defect
  • Stockpile collapse; over-edge
  • Roll-over on slope; struck-by debris
  • Collision
  • Slip, trip, fall
  • Inadvertent movement
  • Crush
  • Air; spill; runoff
  • Drift

Legislation & Codes of Practice

  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Pt 6.3 Excavation
  • AS 3798:2007
  • Code of Practice: Excavation work
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • AS 2890.6
  • WHS Reg 2017 Hazardous Manual Tasks
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Sch 18 (HRCW)
  • Code of Practice: Construction work
  • EPA Act
  • AS 1940
  • POEO Act
  • WHS Reg 2017 Sch 18 (HRCW)
  • Code of Practice: Construction work

What You Receive

PDFPersonalised PDF

Included SOP Documents

Free with this SWMS

SWMS + Included SOPs

$29.95AUD
  • Personalised PDF document
  • Instant download after purchase
  • Auto-populated with your company details
  • 1 SOP included free — SOP-EAR-003
Cornerstone SWMS

Professional SWMS and SOP documents for Australian workplaces. Professionally drafted, editable, and instantly downloadable.

Legislation & Standards

  • Work Health and Safety Act 2011 (Cwlth)
  • State & Territory WHS Legislation
  • Safe Work Australia Guidelines

Disclaimer: All documents provided on this platform are templates and starting points only. They must be reviewed, adapted, and approved by the Person Conducting a Business or Undertaking (PCBU) or facilitated by a designated WHS Manager, Site Supervisor, or Principal Contractor, before use at any specific worksite. Site-specific hazards, conditions, and legislative requirements may vary. Cornerstone SWMS accepts no liability for documents used without appropriate review and customisation.

© 2026 Cornerstone SWMS. All rights reserved.