SWMSCivil Works

Tandem Smooth Roller Operation (Including Pre-Operational Inspection and Shutdown Procedure)

SWMS-CPT-002

About this Document

The SWMS-CPT-002 Tandem Smooth Roller is designed to address the safety hazards associated with operating tandem smooth rollers in civil works. It outlines crucial safety measures for preventing incidents such as slips, trips, roll-overs, and exposure to noise and dust. This document is essential for construction managers and operators to ensure compliance with WHS regulations and to promote a safe working environment.

Hazards & Risks Covered

  • Public road interaction; pedestrian struck-by
  • Roll-over on slope; struck-by; runaway on incline
  • NIHL; respirable dust
  • Public road incident
  • Inadvertent movement on slope
  • Crush
  • Air; spill
  • Drift

Legislation & Codes of Practice

  • AS 1742.3
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • AS/NZS 1269
  • AS/NZS 1270
  • AS/NZS 1715
  • AS/NZS 1716
  • Heavy Vehicle National Law
  • AS 1742.3
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Part 5.1 & 5.3 Plant
  • AS 2550.1
  • AS 4024 series
  • WHS Reg 2017 Sch 18 (HRCW)
  • Code of Practice: Construction work
  • EPA Act
  • AS 1940
  • WHS Reg 2017 Sch 18 (HRCW)
  • Code of Practice: Construction work

What You Receive

PDFPersonalised PDF

Included SOP Documents

Free with this SWMS

SWMS + Included SOPs

$29.95AUD
  • Personalised PDF document
  • Instant download after purchase
  • Auto-populated with your company details
  • 1 SOP included free — SOP-CPT-002
Cornerstone SWMS

Professional SWMS and SOP documents for Australian workplaces. Professionally drafted, editable, and instantly downloadable.

Legislation & Standards

  • Work Health and Safety Act 2011 (Cwlth)
  • State & Territory WHS Legislation
  • Safe Work Australia Guidelines

Disclaimer: All documents provided on this platform are templates and starting points only. They must be reviewed, adapted, and approved by the Person Conducting a Business or Undertaking (PCBU) or facilitated by a designated WHS Manager, Site Supervisor, or Principal Contractor, before use at any specific worksite. Site-specific hazards, conditions, and legislative requirements may vary. Cornerstone SWMS accepts no liability for documents used without appropriate review and customisation.

© 2026 Cornerstone SWMS. All rights reserved.